Please Note: Gozonews.Com is now simply Gozo.News - Kindly update your bookmarks and links - Existing Gozonews.Com links should continue to function correctly

Summer break time in Gozo from dust, demolition and noise

Email item Email item Print item Print item

Break time from dust and noise during the summer months in GozoThe demolition and excavation phase at construction sites is by far the greatest inconvenience for the surrounding neighbourhood, the Planning Authority said today. In view of this, the Authority advised that no demolition and excavation works will be permitted within tourism areas during the summer months.

Spearheaded by the Malta Tourism Authority (MTA) in collaboration with the Building Regulation Office (BRO) and the Planning Authority, they have identified the tourism areas where demolition and excavation works will not be permitted during the coming three months of summer.

Any illegal excavation and demolition work carried out in the identified streets and localities between the 15th June and the 30th September, may be reported to the Building Regulation Office on telephone number 2292 7608 (during office hours) or 99637508 (after office hours).

In a statement the Planning Authority said that “the legal notice mitigates the nuisance that such sites have on both the tourism industry and the number of Maltese families who move to their summer residence.”

The Authority concluded by saying that “if there are any streets that you wish to see included in next year’s Tourist Areas List, please send an email to your Local Council for onward transmission to the Malta Tourism Authority by the end of July 2019.”

The localities and streets in Gozo for summer 2019 are shown below:

MARSALFORN, GOZO ALL STREETS/AREAS IN MARSALFORN INCLUDING:

TRIQ IL-WIED (Car Park till Sea)

PJAZZA M. A. REFALO

OUR LADY OF SORROWS STREET

TRIQ IL-FORN

TRIQ SAN GUZEPP

TRIQ MUNGBELL

TRIQ SANTA MARIJA (FROM TRIQ PORT UP TO TRIQ XTUT)

TRIQ ULISSE

TRIQ PORT

TRIQ QBAJJAR

TRIQ GHARQAWQLA

GHAR QAWQLA

PJAZZA SAN PAWL T

RIQ L-ISQOF GUZEPPI PACE

TRIQ ID-DULURI

TRIQ IS-SAJJIED

TRIQ IX-XAGHRA

TRIQ IL-PLEJJU

TRIQ FRANK DEBONO

TRIQ LAPSI

TRIQ IR-RABAT

TRIQ IL-LUZZU

TRIQ IT-TORN

TRIQ DAHLET GHARAJJEX

TRIQ TA’BARDA

TRIQ IL-QOLLA S-SAFRA

TRIQ MANWEL MAGRO

TRIQ IX-XTUT

TRIQ IL-LIFURNA

TRIQ IN-NAHLA

TRIQ MIGEL BAHAR

TRIQ HABEL TWIL

TRIQ IX-XWEJNI.

MGARR/GHAJNSIELEM

MGARR WHARF

TRIQ MARTINO GARCES

TRIQ MARINA

TRIQ DE VILHENA

TRIQ IR-REBHA

TRIQ MANUEL VILHENA

TRIQ IX-XATT

TRIQ LOURDES

TRIQ IL-HAMRI

TRIQ IZ-ZEWWIEQA

TRIQ L-IMGARR

TRIQ SANT ANTNIN (FROM TRIQ L-IMGARR UP TO TRIQ ZEWWIEQA).

RAMLA L-HAMRA, ALL AREAS.

SAN LAWRENZ

TRIQ IL-GEBLA TAL-GENERAL (FROM IT-TORRI TAL- GEBLA TAL-GENERAL UP TO THE SEA).

VICTORIA

TRIQ DUN KARL BONDI

TRIQ AGIUS DE SOLDANIS

TRIQ PALMA

MISRAH INDIPENDENZA

MISRAH SAN GORG

MISRAH SAVINA

MISRAH SANTU WISTIN

TRIQ REPUBLIKA

MAIN GATE STREET

TRIQ IL-MADONNA TAL-KARMNU

TRIQ L-EWROPA.

XAGHRA

TRIQ GEBLA TAS-SANSUNA

TRIQ GNIEN IMRIK

TRIQ GUZEPPI BAJADA

TRIQ BULLARA.

XLENDI

ALL STREETS/AREAS IN XLENDI, AND INCLUDING:

PJAZZA L-ANFORI

TRIQ CARMEL (FROM XLENDI BAY UP TO TRIQ RAN- CIS)

TRIQ SAN XMUN

IL-BAJJA TAX-XLENDI (XATT IX-XLENDI)

TRIQ IL-KANTRA

TRIQ IT-TORRI

TRIQ IL-PUNICI

TRIQ IL-BIZANTINI

TRIQ IL-QSAJEM

TRIQ IR-RUMANI

TRIQ IR-RABAT

TRIQ IL-MADONNA TAL-KARMNU

TRIQ IS-SAJJIEDA

TRIQ IS-SINJA

TRIQ IL-GOSTRA

TRIQ L-GHAR TA’ KAROLINA

TRIQ IL-QROLLA

TRIQ IZ-ZERZIEB

TRIQ IR-RANCIZ

TRIQ IL-KAVALLIERI.

The MTA is the Competent Authority to identify the localities and streets where demolition or excavation works cannot be carried out. The MTA said that it reserves the right to change or amend the list of streets as it deems necessary.

  • Permalink: Summer break time in Gozo from dust, demolition and noise
  • You may also like...

    Leave a Reply

    Your email address will not be published. Required fields are marked *