An intensive and sustained programme of infrastructural refurbishment works has been implemented at several schools within the Gozo College over the past few months.
Works are now underway at the Sannat Primary, the latest school to be included in this programme.
The refurbishments carried out included plastering and painting of external and internal walls; removal of existing windows and replacement with double glazed aluminium windows; removal of existing internal doors and replacement with timber doors; removal of existing interior tiles and laying of new tiles and repairs to damaged/cracked walls and solidifying and reinforcing an existing damaged floor.