€3 million infrastructural project for Kercem Primary School
Email item
| Print item
|
|
Kercem Primary School, part of the Gozo College, is undergoing a complete transformation with an investment of €3.2 million in an infrastructural project that will see the extensive refurbishment of the existing school, the Government said.
It added that “this will lead to the students, educators and staff of this school having modern, accessible, and comfortable educational spaces, both indoors and outdoors.”
Minister for Education, Sport, Youth, Research and Innovation Clifton Grima, together with Minister for Gozo and Planning Clint Camilleri, visited the work being carried out by the Foundation for Schools of Tomorrow.
The Ministers also met the students from Kercem who are currently receiving their education in a temporary school, “made up of prefabricated classrooms of the highest level, which were installed in order to ensure a safe and quality educational environment while work is underway in the existing building,” the Government said.
Minister Clifton Grima said, “with the investment we are making in the education sector, we are modernising the environment in which our children are receiving their education, and where our educators are providing education. In Gozo alone, a massive investment is being made in this area, not only with what we have done in the Victoria Educational Complex, which is the only one of its kind and in which we have invested €18 million, but also in the schools scattered across the island.”
Minister Clint Camilleri stated that, “we are continuing to make a strong investment in education in Gozo, during the next year, this extensive upgrade will be completed, including new furniture, so that from the 2026 scholastic year, students attending Kercem primary school will begin learning in a modern and completely renovated school.”
The Kercem Primary School forms part of the Gozo College, is located in a two-storey building that was built in 1921 and is spread over approximately 1,200 square metres.
It was explained that in addition to the complete beautification of the school, the project includes the redesign of the open and recreational spaces, as well as the creation of new spaces for the teaching of extra-curricular subjects. Through the project, accessibility in the building will be addressed to comply with the law. The outdoor recreational areas will be changed to, among others, have non-slip concrete and artificial turf surfaces.
As part of the project, new services will be installed, including a new electricity, water and sewage service, security cameras, internet connectivity, alarm, and fire safety services. Energy efficient measures will be introduced in the building as required by law.
Photo: DOI


























