A summer break from excavation and demolition works in Gozo
Email item
| Print item
|
|
The Planning Authority has said that, conscious that construction sites are a nuisance and inconvenience, no demolition and excavation works at construction sites will be permitted within tourism areas of Gozo and Malta during the summer months.
This initiative is being spearheaded by the PA in collaboration with the Building Regulation Office (BRO) and the Malta Tourism Authority.
They said that the enforcement of this legal notice “is one way of mitigating the nuisance that construction sites have on both the tourism industry and the number of Maltese families that move to their summer residences.”
Any illegal excavation and demolition works carried out in the identified localities and streets between the 15th of June and the 30th of September, may be reported to the Building Regulation Office on telephone number 2292 7608 (during office hours) or 99637508 (after office hours).
A full list of localities and streets in Gozo where demolition or excavation works are prohibited during the summer months can be viewed below.
The Malta Tourism Authority, whose competence it is to identify the localities and streets where demolition or excavation works cannot be carried out, said that it reserves the right to change or amend the list of streets as it deems necessary.
MARSALFORN, GOZO ALL STREETS/AREAS IN MARSALFORN INCLUDING:
TRIQ IL-WIED (Car Park till Sea)
PJAZZA M. A. REFALO
OUR LADY OF SORROWS STREET
TRIQ IL-FORN
TRIQ SAN GUZEPP
TRIQ MUNGBELL
TRIQ SANTA MARIJA (FROM TRIQ PORT UP TO TRIQ XTUT)
TRIQ ULISSE
TRIQ PORT
TRIQ QBAJJAR
TRIQ GHARQAWQLA
GHAR QAWQLA
PJAZZA SAN PAWL
TRIQ L-ISQOF GUZEPPI PACE
TRIQ ID-DULURI
TRIQ IS-SAJJIED
TRIQ IX-XAGHRA
TRIQ IL-PLEJJU
TRIQ FRANK DEBONO
TRIQ LAPSI
TRIQ IR-RABAT
TRIQ IL-LUZZU
TRIQ IT-TORN
TRIQ DAHLET GHARAJJEX
TRIQ TA’BARDA
TRIQ IL-QOLLA S-SAFRA
TRIQ MANWEL MAGRO
TRIQ IX-XTUT
TRIQ IL-LIFURNA
TRIQ IN-NAHLA
TRIQ MIGEL BAHAR
TRIQ HABEL TWIL
TRIQ IX-XWEJNI
MGARR/GHAJNSIELEM, GOZO
MGARR WHARF
TRIQ MARTINO GARCES
TRIQ MARINA
TRIQ DE VILHENA
TRIQ IR-REBHA
TRIQ MANUEL VILHENA
TRIQ IX-XATT
TRIQ LOURDES
TRIQ IL-HAMRI
TRIQ IZ-ZEWWIEQA
TRIQ L-IMGARR
TRIQ SANT ANTNIN (FROM TRIQ L-IMGARR UP TO TRIQ ZEWWIEQA)
RAMLA L-HAMRA, GOZO ALL AREAS
SAN LAWRENZ, GOZO
IZ-ZONA TAD-DWEJRA
TRIQ IL-GEBLA TAL-GENERAL (FROM IT-TORRI TAL-GEBLA TAL-GENERAL UP TO THE SEA)
VICTORIA, GOZO
TRIQ DUN KARL BONDI
TRIQ AGIUS DE SOLDANIS
TRIQ PALMA
MISRAH INDIPENDENZA
MISRAH SAN GORG
MISRAH SAVINA
MISRAH SANTU WISTIN
TRIQ REPUBLIKA
MAIN GATE STREET
XAGHRA
TRIQ GEBLA TAS-SANSUNA
TRIQ GNIEN IMRIK
TRIQ GUZEPPI BAJADA
XLENDI, GOZO ALL STREETS/AREAS IN XLENDI, AND INCLUDING:
PJAZZA L-ANFORI
TRIQ CARMEL (FROM XLENDI BAY UP TO TRIQ RAN- CIS)
TRIQ SAN XMUN
IL-BAJJA TAX-XLENDI (XATT IX-XLENDI)
TRIQ IL-KANTRA
TRIQ IT-TORRI
TRIQ IL-PUNICI
TRIQ IL-BIZANTINI
TRIQ IL-QSAJEM
TRIQ IR-RUMANI
TRIQ IR-RABAT
TRIQ IL-MADONNA TAL-KARMNU
TRIQ IS-SAJJIEDA
TRIQ IS-SINJA
TRIQ IL-GOSTRA
TRIQ L-GHAR TA’ KAROLINA
TRIQ IL-QROLLA
TRIQ IZ-ZERZIEB
TRIQ IR-RANCIZ
TRIQ IL-KAVALLIERI.



























Excavation and demolition?
What about the sawing/cutting of stones?
What about cranes blocking the streets?
And neverending cutting noise and dust in public Holidays too???Destroyed plants dirty street and stairs blocked Doors and garage terrible
Today it is 1st July and in xlendi excavation work still going on at triq iz-zirzieb. How come nobody stops these cowboys???
I have been calling the mobile number listed in this article all day. First no one answered now its always busy. Hmmmm something fishy??